BOE’s June quarterly indicates ramp-up of uranium production at the 100% owned Honeymoon project is progressing on schedule. Importantly, newly installed ion exchange technology is operating at or above expectations. Region drilling at the Gould’s Dam deposit returned intercepts of grade. Production at Alta Mesa (30% BOE) has also begun in the United States. SeeRead more
Argonaut | The Natural Choice in Resources.
© 2024 Argonaut.